REPLACING A LOST ANCHOR ON A CONTAINER SHIP

ALATAS’ SERVICE MERCHANT SHIPPING LOCATION   ASIA / SINGAPORE / EQUIPMENT   SHIPS ANCHOR BACKGROUND: The vessel lost its anchor when the shank ruptured, causing the anchor crown, along with its arms and flukes, to sink into the sea. An urgent replacement was necessary. ALATAS SOLUTION: ALATAS specializes in anchor replacement repairs, typically conducting them […]

REPLACING A LOST ANCHOR ON A CONTAINER SHIP Read More »

Janus Grab Troubleshoot

ALATAS’ SERVICE FIELD SERVICE LOCATION   ASIA / INDONESIA / ANCHORAGE, MAURA JAWA EQUIPMENT   SHIP CRANES BRAND / MODEL GRAB / BULK CARRIER / JANUS AS25 (6-12) 9.5-00 Introduction: Alatas Indonesia has been requested by the client to carry out grab troubleshooting on the vessel during anchorage. Background: The client has requested Alatas Indonesia

Janus Grab Troubleshoot Read More »

Damaged Boom Repair As Per The Class-Approved Repair Proposal.

ALATAS’ SERVICE FIELD SERVICE LOCATION   EMEA / UAE / KHORFAKKAN PORT EQUIPMENT   SHIP CRANES / DECK CRANES BRAND / MODEL TTS KL36T X 28M Introduction: During a recent inspection of the booms, it was discovered that both crane no. 3 and crane no. 4 sustained damage in multiple locations. Additionally, crane no. 3’s

Damaged Boom Repair As Per The Class-Approved Repair Proposal. Read More »

Spooling and Inspections

ALATAS’ SERVICE FIELD SERVICE LOCATION   AMERICAS / USA / DELAWARE EQUIPMENT   CRAWLER CRANE BRAND / MODEL LIEBHERR LR13000 INTRO Alatas Americas, Inc. was contracted to complete the following: BACKGROUND As per the client’s request to remove a damaged part of wire on the Liebherr LR13000 Crawler Crane Winch/Hoists x 2. ALATAS’ SOLUTION A

Spooling and Inspections Read More »

Calibration of load monitoring system with external load cell

ALATAS’ SERVICE FIELD SERVICE LOCATION   EMEA / LAS PALMAS / SPAIN EQUIPMENT   OFFSHORE WINCHES / HANDLING WINCHES BRAND / MODEL ANCHOR HANDLING WINCH HATLAPA 400T Introduction: Alatas Poland recently collaborated with an offshore client to calibrate the AHTS 400Te winch and its load indication system during the vessel’s dry dock period. Background: The

Calibration of load monitoring system with external load cell Read More »

Replacement of complete set of pumps and motors on NMF 150T heavy lift vessel

ALATAS’ SERVICE FIELD SERVICE LOCATION   SAO TOME / LISBON EQUIPMENT   SHIP CRANES / HEAVY LIFT CRANE 150T BRAND / MODEL NMF 150T Introduction: Alatas Poland was tasked with the replacement of pumps and motors for the NMF 150T crane. This article delves into the background, challenges faced, and effective solutions implemented by Alatas

Replacement of complete set of pumps and motors on NMF 150T heavy lift vessel Read More »

Slewbearing Changeout – Jacking System Design

ALATAS’ SERVICE ENGINEERING / PARTS SUPPLY / FIELD SERVICE LOCATION   ASIA / MALAYSIA / OFFSHORE EQUIPMENT   OFFSHORE PEDESTAL  CRANES / RAM LUFFING CRANE BRAND / MODEL SEACRANE K55-90 Introduction: Alatas was entrusted with the task of designing a jacking system and executing the slewbearing replacement for the Seacrane on a fixed offshore asset

Slewbearing Changeout – Jacking System Design Read More »

Renewal of jib head sheaves of  the 3rd Crane in Romania, Costansa

ALATAS’ SERVICE FIELD SERVICE LOCATION   EMEA / ROMANIA / COSTANSA EQUIPMENT   SHIP CRANES / DECK CRANES BRAND / MODEL MACGREGOR GLB3628-2/ 28.828GR   Introduction: Alatas Turkey technicians undertook a journey to Costansa, Romania, to service a vessel, engaging in tasks that ranged from coordinating with the crew to preparing and testing the crane,

Renewal of jib head sheaves of  the 3rd Crane in Romania, Costansa Read More »

THE FAILURE OF THE DECK CRANE HOISTING SYSTEM OF CRANE NO 2,3 AND 4

ALATAS’ SERVICE FIELD SERVICE LOCATION   EMEA / TURKEY / KACAELI EQUIPMENT   SHIP CRANES Introduction: Recently, cranes No. 2, 3, and 4 faced challenges in their hydraulic systems, disrupting regular operations. Technicians from Alatas Turkey were swiftly deployed to address these issues and restore functionality. This article delves into the background of the problem,

THE FAILURE OF THE DECK CRANE HOISTING SYSTEM OF CRANE NO 2,3 AND 4 Read More »