Alatas Service | Field Service, Engineering |
Location | Vlissingen, Netherlands |
Crane Manufacturer | NMF |
Crane Spec | 1000ton |
Alatas Europe was asked to perform this NMF crane jib removal in Vlissingen in the Netherlands which included the preparation, disconnection and removal of the extension jib from a 1000ton crane.
Job Scope
- Preparation for jib removal
- Removal of the main rams horn hook
- Removal main hoist wire rope and tugger winch lines
- Securing of jib mast
- Removal of fibre pendants
- Removal of extension jib
Job Gallery for NMF Crane Jib Removal in the Netherlands
Removing the hook from the block swivel Separating the hook from the block Securing the block on the deck Un-reeving the hoist wire from drum 1 to drum 2 Setting down the boom in horizontal position Securing the mast with lashing wires to the deck Lifting the jib to install the mast stay bars Mast stay bars installed Disconnecting the back fibre pendant ropes Lifting the fibre pendant rope down Setting the jib end down onto the deck Setting up the hydraulic jack and pulling gear Attaching the jib lifting slings Lowering down the main jib pin to the deck Removing the jib from the main boom Setting down the jib onto the deck Pendant pin safety lock Pendant pin anti-rotation locks (missing on the jib head) Main jib pin lubrication Main jib pin bush lubrication