CRANE INSPECTION / MAINTENANCE PROGRAM plus ROBWAY FAULT FINDING, RECOMMISSIONING, AND HEALTH CHECKS

ALATAS’ SERVICEFIELD SERVICE
LOCATION  EMEA / UK / CURACAO
EQUIPMENT  OFFSHORE CRANES
BRAND / MODELFAVELLE FAVCO 6/10K PC150

INTRO

ALATAS UK Ltd. was tasked by our client with an inspection and maintenance program on the two Favelle Favco cranes.  This included recommissioning and fault-finding on a Robway system

BACKGROUND

Cranes require yearly maintenance, inspection, and load tests before long-term mobilization.

ALATAS’ SOLUTION

Alatas carried out inspection, maintenance, and function tests as per PMRs.  This included inspection of pumps, motors, drive spline pinions, etc. During our inspections, it became clear that the Robway system was not functioning correctly.  We undertook fault-finding and recommissioned the system, including load testing.  Scope expanded to Splitter/winch/slew gearbox oil replacement and a slew bearing changeout.

Inspections and maintenance were conducted according to the work scope, Alatas work procedure, and the inspection checklist, along with the identification of defective components. Upon completion of the work scope, Alatas UK technicians highlighted some areas of concern on the cranes inspected during the inspection and maintenance program.

 These issues included:

1. Excessive corrosion on drive splines (No. 2 slew drive)

2. Metal debris was found on the drain plug.

3. Removal and replacement of the faulty pump

4) Kinks present in the rope

JOB SCOPE

Favelle Favco PC 150 S/N 1190 Crane, Port Crane 5000 HR/24 Monthly Inspection and Maintenance Program

1. Inspection of Main Hoist spline pinion drives

2. Inspection of Luff Hoist spline pinion drives

3. Inspection of Fly Hoist Winch splined pinion drives

4. Inspection of Slew Drives: splined pinion drives

5. Lubricate splines on pinion drives

6. Function test

8000 HR/36 Monthly Inspection and Maintenance Program

1. Inspection and maintenance of the hoist winch pump

2. Inspection/Maintenance of Slew Drive pump

3. Inspection/Maintenance of Luff Winch pump

4. Inspection and maintenance of Hoist and Fly Winch pumps

5. Inspection and Maintenance of Hoist Winch Hydraulic Motors (3 of)

6. Inspection and Maintenance of Slew Drive Hydraulic Motors (3 of)

7. Inspection and Maintenance of Luff Winch Hydraulic Motor (3 of)

8. Inspection and Maintenance of Hoist and Fly Winch Hydraulic Motors (3 of)

9. Function test

10. Carry out a load test.

Robway Scopes Fault Finding, Recommissioning, and Health Checks Additional Scope

1. Splitter/Winch/Slew Gearbox oil replacement

Favelle Favco 6/10K S/N 1191 Crane, Stbd Crane 5000 HR/24 Monthly Inspection/Maintenance Program

1. Inspection of Main Hoist spline pinion drives

2. Inspection of Luff Hoist spline pinion drives

3. Inspection of Fly Hoist Winch splined pinion drives

4. Inspection of Slew Drives: splined pinion drives

5. Lubricate splines on pinion drives

6. Function test

8000 HR/36 Monthly Inspection/Maintenance Program

1. Inspection and maintenance of the hoist winch pump

2. Inspection/Maintenance of Slew Drive pump

3. Inspection/Maintenance of Luff Winch pump

4. Inspection/Maintenance of Hoist Winch Hydraulic Motor, (2 of)

5. Inspection/Maintenance of Slew Drive Hydraulic Motors (2 of)

6. Inspection/Maintenance of Luff Winch Hydraulic Motor (2 of)

7. Inspection/Maintenance of Hoist and Fly Winch Hydraulic Motors (2 of)

8. Function test

10000 HR/ 4 Yearly Inspection/Maintenance Program

1. Inspection of Slew Drive spline pinions

2. Inspection of Luff Drive spline pinions

3. Inspection of Hoist Drive splined pinions

4. Function test

5. Carry out a Load test

Additional Scopes

1. Slew Bolt changed out.

2. Splitter/Winch/Slew Gearbox oil replacement

Crane Load Testing utilising Alatas water bags

Calibrated unloaded hook on main and aux

Installation of new PCB on the Robway load computer

Share Article