Norlift crane: emergency repairs to Zollern hoist winch
Norlift Crane, SWL 30t x 26m. Emergency Repairs on Zollern Hoist Winch
The vessel was stuck in Thailand with a seized hoisting winch, the Zollern planetary gearbox, type ZHP 4.31 was found completely smashed up. With only onboard means, some old spare parts and the ingenuity of our crane specialist engineer, ALATAS managed to re-build the gearbox into a temporarily functional state. Naturally, ALATAS already sourced a competitively priced replacement gearbox that will be installed soonest.
Norlift crane: emergency repairs to Zollern hoist winch gallery:
Norlift crane
Norlift crane SWL
Removing winch drum from crane
Winch drum
Cleaning up drum
Winch mounting
Removing gearbox from drum
Installing gearbox
Small planetary
Big planetary
Planetary housing gears
Damaged planetary gear housing
Damaged planetaries
Damaged planetaries
Damaged sun gear
Pitted roller
Brake unit
Damaged housing
Replacing planetaries
Seized bearing
Damaged planetaries
Damaged roller face and gearing
Housing
Damaged roller runner
Damaged roller runner
Pitted roller
Replacement housing
Damaged planetary gearing
Removing race bearing
Cleaning up planetary gear housing
Replacing rollers
Installing large planetary and housing after repair