|
|
|
|
|
|
New slew bearing unpacking |
Cleaning and loosening of bolts |
Cleaning at crane1 base column |
|
|
|
|
|
|
| |
|
|
|
|
|
Crane lifted by floating barge crane |
Crane lifted by floating barge crane |
Crane lifted by floating barge crane |
|
|
|
|
|
|
| |
|
|
|
|
|
Crane lifted by floating barge crane |
Installing new bearing |
Crane lifted by floating barge crane |
|
|
|
|
|
|
| |
|
|
|
|
|
Crane lifted by floating barge crane |
Crane lifted by floating barge crane |
Crane slew bearing |
|
|
|
|
|
|
| |
|
|
|
|
|
Ready to fix mounting bolts |
Slew ring installation |
Dismantle boom from crane 1 |
|
|
|
|
|
|
| |
|
|
|
|
 |
Fixing slew ring mounting bolts |
Crane 1 base column |
Max clearance |
|
|
|
|
|
|
| |
|
|
|
|
 |
Crane lifted by floating barge crane |
Crane lifted by floating barge crane |
Crane lifted by floating barge crane |
|
|
|
|
|
|
| |
|
|
|
|
 |
Crane lifted by floating barge crane |
Crane 1 and Crane 2 |
Fixing crane 2 boom at night |
|
|
|