The management of Dubai Dry Docks invited ALATAS to join the professional internal maintenance team of Dubai Dry Docks for the repair of a damaged dock crane that serves two of the largest dock facilities at the yard in Bur Dubai.
The job scope included the following:
Complete project management.
Condition evaluation and damage assessment of the complete dock crane.
Engineering, design and structural calculation of a new travelling arrangement.
Preparation of a full de-commissioning, repair, fabrication and commissioning documentation.
Supervising of de-commissioning, repair, fabrication and commissioning.
Establishing an updated crane certification document package and submission to the authorities for review and approval.
Load and overload test of the crane using a complete barge as test weight.
Hand over.
ALATAS' vast expertise in procurement of spare parts for outdated cranes, our experienced engineers and our workshop resources were put to good use on this project.
ALATAS Dubai is pleased how the project was managed jointly with the Dubai Dry Docks as it was the first government job Alatas Dubai received, being a still relatively young operation in the Middle East.
The handover of the appreciation certificate of Dubai Dry Docks World to Alatas Dubai underlines the satisfaction of the customer and will be maintained in the years to come.
Bailey dock crane repair at Dubai Dry Docks gallery:
Overhauled and Inspected Boom
Overhauled and Inspected A-Frame
Final Outfitting of travelling Section
Welding of Bogie Frame to travelling Section
New Fabricated travelling Section
levelling and Welding of travelling Section
Installation of Machinery House and A-Frame
Installation of Boom
Installation of Boom
Sample New Fabrication Drawings
Structural Analysis Section of
Dock Crane travelling Gear