Four BLM cranes - 4GE-C3 successfully repaired by Alatas.
The BLM cranes are fully electric cranes with a Thyristor controlled drive system. The owner had engaged numerous contractors, electric workshop and crane technicians over the past couple of months, but none was able to troubleshoot and repair these cranes.
ALATAS was called for help. Our specialized BLM experts had no trouble identifying the problem, our spare parts specialists supplied the required spare parts and the cranes were fixed!
BLM ship crane gallery:
Adjust crane #2 slew brake
Bad contact crane #1 hoisting
Burned cable
Limit switch burned cable
Change 24vdc relay
Gate controls require replacement
Crane hoisting card defective
Crane #4 luffing relay
Bad contact tip of hoisting component
Crane #3 luffing controls
Crane #4 hoisting limit switch bypass to be removed